
Home / Services
ASME-stamped pressure piping and mechanical installation inside operating facilities, where a mistake shuts down production and a schedule slip has real cost attached to it.
Pressure piping work inside a live refinery or process unit does not get a second attempt. Our crews hold the ASME A and PP stamps and the NBIC R stamp specifically because this scope demands documentation and code compliance that cannot be waved off after the fact, and because owners need to know the crew standing inside their operating unit is cleared to be there.
Process piping installation
Drawings reviewed against ASME code requirements before a single spool is cut.
Spools fabricated in our Superior shop to code, not adjusted for it in the field.
Crews cleared for live-plant work install and tie in with production schedules in mind.
Every pressure system tested and documented to the standard your engineering team can sign off on.
Certified for power boiler assembly and pressure piping fabrication, not just general mechanical work.
Certified for repair and alteration of pressure-retaining items already in service.
Experienced working inside operating refineries and process plants, not just greenfield sites.
Superior Refinery Rebuild
A full refinery rebuild inside a live facility, where ASME-stamped piping crews worked to a schedule set by the refinery's own operating requirements, not the other way around.
Yes, our crews are experienced with hot-work permitting and safety orientation requirements specific to operating refineries and process plants.
Yes, we hold the NBIC R stamp for repair and alteration of pressure-retaining items already in service.
It scales to the outage. We have staffed piping and mechanical crews as part of maintenance projects up to 300 multi-trade personnel.

Budget-stage or bid-ready, we will give you a straight answer on scope, schedule, and who runs it.