Pre-Construction

We get involved before drawings are final, so budget and buildability decisions get made with real construction cost in the room, not discovered after the contract is signed.

Service 01

What's included

Owners lose more money to decisions made before a shovel hits the ground than almost anywhere else in a project. Long-lead equipment ordered too late, a foundation designed without asking the crew who has to build it, a budget built on square-footage averages instead of the actual site conditions. Our pre-construction team sits in on the early conversations specifically to catch that class of mistake, using the same cost data our self-performed crews generate on live projects, not published estimating tables.

  • Constructability reviews and value engineering
  • Preliminary and budget-stage cost estimating
  • Permitting and long-lead procurement support
  • Schedule development for planned outages and shutdowns
Lakehead Constructors headquarters in Superior, Wisconsin Where every project starts
How It Works

Our process for this scope

Step 1

Site Walk & Scope Review

We walk the site with your team before anything is priced, so the estimate reflects real conditions, not assumptions.

Step 2

Constructability & Value Engineering

Design intent gets checked against how it will actually be built, and against what it will cost to build it that way.

Step 3

Budget-Stage Estimating

A defensible number your team can take to leadership, with the assumptions behind it spelled out.

Step 4

Long-Lead Procurement Plan

Transformers, structural steel, specialty valves. Anything with a long lead time gets identified and ordered before it becomes the critical path.

Why Lakehead

What backs this service up

110 Years Estimating Heavy Work

We have priced this kind of project since before most estimating software existed.

Estimates From Our Own Field Data

Our numbers come from what our self-performed crews actually spend, not a national cost book.

ISO 9001:2015 Documented Process

Every estimate follows the same audited procedure, project to project.

Thompson Dam water control gate rehabilitation Thompson Dam Gate Rehabilitation
Proof, Not Promises

Thompson Dam Gate Rehabilitation

Minnesota PowerCarlton County, Minnesota

A public-infrastructure rehabilitation project where the budget-stage estimate had to hold up through a full design and permitting cycle before construction started. Our pre-construction team's early involvement kept the final bid within range of the original number.

Common Questions

Pre-Construction, answered

As early as you have a concept and a rough budget target. The earlier we see it, the more our input can actually change the cost, not just confirm it.

It depends on scope and whether the project is expected to convert to a Lakehead build. Call us and we will give you a straight answer for your situation.

Yes. We regularly review third-party design packages for constructability and cost before construction, whether or not we end up building it.

Pairs Well With

Related services

Since 1916

Ready to talk through your Pre-Construction scope?

Budget-stage or bid-ready, we will give you a straight answer on scope, schedule, and who runs it.

Call Now Discuss Your Project